Planning a New Bathroom in the New Year: A Simple Timeline

Planning a new bathroom at a kitchen table in winter with a floor plan sketch, tape measure, tile samples and a brushed brass tap

TL;DR: The best time to plan a new-year bathroom is over Christmas: gather ideas and measure up in December, book a design consultation in early January, then order everything at least 4 to 6 weeks before your fitter starts if any of it is made to order. That way the bathroom is finished in early spring, not halfway through summer.

January is when a lot of people decide that this is the year they finally sort out the bathroom. It makes sense: you have just spent a fortnight sharing it with the whole family, and every tired tile and dripping tap has been on show. The trick is to turn that motivation into a plan, so the work actually happens.

Here is a simple timeline that works.

Over Christmas: ideas and measurements

Use the quiet days between Christmas and New Year to work out what you want. Start with what annoys you about the bathroom you have. Is it too cold? Is there nowhere to put anything? Do you want a bath, a shower, or both? Those answers matter more than any trend.

Then gather ideas. Save pictures of bathrooms you like, and notice what they have in common: the colours, the finish of the taps, whether the furniture is wall hung or freestanding. Our guides to bathroom trends for 2027 and bathroom colour trends are a good place to start.

Finally, measure the room. Length, width and ceiling height, plus the position of the window, door, radiator and soil pipe. A rough sketch with measurements is all you need to bring to a consultation.

Early January: set a budget

A bathroom budget is about more than the bath and toilet. It includes tiles, taps, lighting, labour, removing the old suite and making good. Our guide to bathroom renovation costs in Birmingham explains what affects the price and where the money goes.

It helps to decide early where you want to spend and where you are happy to save. You might put the money into a cast iron bath or a digital shower you will use every day, and choose simpler pieces elsewhere.

January: book a design consultation

This is where a plan becomes a design. At a free one-to-one consultation at our Birmingham showroom, we go through your measurements and ideas, show you the finishes in person and work out a layout that fits. You leave with a clear idea of what goes where, and afterwards you get an itemised quote, so you can see exactly what you are paying for.

Seeing things in person matters more in a bathroom than almost anywhere else. Brushed brass looks different in daylight, a basin is bigger or smaller than you imagined, and a tile you loved online might be too busy across a whole wall.

Late January to February: order early

This is the step people most often leave too late. Stock items arrive in 3 to 5 working days, but made to order pieces take 4 to 6 weeks. That includes cast iron baths, coloured Imperial finishes and whirlpool baths.

Order everything well before your fitter is booked to start. Having every piece on site before the old bathroom comes out avoids weeks without a working bathroom while you wait for one missing tap.

Spring: fitting

With everything delivered, the work itself usually takes one to three weeks depending on the size of the room and how much changes. Moving the toilet or the shower takes longer than replacing like for like. If we are fitting your bathroom as part of a project, we plan the order of work so the room is out of action for as short a time as possible.

Decisions to make first

If you only make a few decisions in January, make these, because everything else follows from them:

The layout: where the bath, shower, toilet and basin go. Moving them is the biggest single cost. Our guides to small bathroom layouts and walk-in showers and wet rooms can help.

The bath or the shower: a freestanding bath, a shower bath or a walk-in shower. See our guides to cast iron vs acrylic baths and digital vs thermostatic showers.

The finish: chrome, matt black, brushed brass or something else. It decides the taps, shower, accessories and even the towel rail. Our guide to bathroom tap finishes compares them.

Just want a quick refresh?

Not every bathroom needs starting again. If the layout works, a new vanity unit, taps, mirror and towel rail can make it feel new in a weekend, and those are mostly stock items. Our guide to getting a bathroom guest-ready covers the quick wins.

Frequently asked questions

When should I start planning a new bathroom?

Two to three months before you want the work done. Planning over Christmas and ordering in January means a spring bathroom.

How long do bathroom products take to arrive?

Stock items arrive in 3 to 5 working days. Made to order items, such as cast iron baths and coloured Imperial finishes, take 4 to 6 weeks.

How long does it take to fit a new bathroom?

Usually one to three weeks, depending on the size of the room and how much of the layout changes.

Do I need a design consultation?

It is not essential, but it helps you avoid expensive mistakes. Ours is free, and you get an itemised quote afterwards.

Book your consultation

Start the new year with a plan. Visit our showroom at 32 Manor Park Rd, Birmingham B36 0DJ (Tuesday to Saturday, 9am to 5pm), call 0121 794 2553 or book your free consultation online. Every project starts with a free one-to-one consultation and a clear, itemised quote.